CASE STUDIES

Leak Sealed Online

High Pressure Gas Leak Sealed Online with a 42” Enclosure Clamp

Wellube successfully sealed a gas leak on a 42” pipeline operating at 45 bar with a 42” enclosure clamp and zero interruption to production.

Read More
Ring Clamp

Steam Leak on an Exchanger Flange Sealed with a 6-part 2m Ring Clamp

Wellube successfully sealed a steam leak on an exchanger with a 2-meter ring clamp with no interruption to production.  

Read More
Wire Saws

Diamond Wire Saws used for Platform Decommissioning in KSA

Wellube supplied a range of Diamond Wire Saws (16” to 30” and 26” to 60”) along with experienced personnel to a major EPC company to complete platform decommissioning in KSA.

Read More
Barrel Split Tee

2” Line Stopping Completed with Barrel Split Tee

Wellube successfully performed 2” hot tap and line stop for an instrument line and nitrogen line to assist the client in repairing of the damaged line.

Read More
Hot tap operation

20” Hot Tap Operation Performed on a Spiral Wound Chilled Water Pipe

Wellube completed a 20” hot tap operation with a customised couple reinforcement solution on a 38” chilled water line for a petroleum refinery in Egypt.

Read More
Chilled Water line Installation Service

Chilled Water Line Isolated Using 16” Single Position Pipe Freezing

Wellube team safely executed qty 2 off 16” Single Position Pipe Freezing to isolate a chilled water line operating at a line temperature between 5.3 degree C to 10.3 degree C and at 5 bar pressure, for a prestigious client to perform their maintenance .activities.

Read More
Valve Flange

On-line Sealing of Wellhead Master Valve Flange Leak

The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity

Read More
Wax-Tape® Anticorrosion Wrap System Installed for 23 Jetty Piles

Anticorrosion Wrap System Installed for 23 Jetty Piles

The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity

Read More
Critical Natural Gas Leak Sealed on a 24” Electrically Insulated Flange

Critical Natural Gas Leak Sealed on a 24” Electrically Insulated Flange

The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity

Read More
48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to Supply

48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to Supply

Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.

Read More