flow management intervention, line stopping, UAE|
29 June 2022|
Post by: Jiju Vijayakumar
36” Crude Oil Line Isolated Using Line Stopping
Wellube completed line plugging on a 36”150# crude oil line through inline tee to provide isolation during shut down to cold cut and replace the existing section of the pipeline.