Contact Us
CASE STUDIES

Customised Pipeline Clamp Avoids Operational Disruption

Customised Pipeline Clamp Avoids Operational Disruption

Wellube successfully completed online sealing of 68” expansion bellow sea water leak in Abu Dhabi.

Read More
Platform Leg Decommissioning Completed in 7 Months

Platform Leg Decommissioning Completed in 7 Months

Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.

Read More
Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria

Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria

Successfully completed a 10” and 12” double position line stop operation in Nigeria.

Read More
Pipe freezing operation - thumbnail

20” Chilled Water Line Isolated Successfully Using Pipe Freezing in Oman

Simultaneous double position pipe freezing performed on 20” chilled water lines in Muscat.

Read More
hottapping-thumbnail

Hot tapping used to create branch pipeline without shutdown

Wellube completed a 4” branch from a 12” main pipeline using hot tapping without shutdown.

Read More
68 Enclosure Clamp-thumbnail

68” Enclosure Clamp ensures continuous plant operability

Continuous plant operability managed by performing online leak sealing on a 68” pipe flange.

Read More
folding plugging

66” water line hot tapped in 36 hours

Successfully performed line stopping and hot tapping on a live 66″ cooling water line.

Read More
specialized pipeline clamp

Specialised pipeline clamp avoids pipeline disruption

Specialist pipeline leak clamp designed & delivered to avoid costly production disruption for client.

Read More
sticky contact
Popup close