Completed a double position line stop operation on a 32ā gas flare.
Gate valve replaced using customised mechanical head in a fire water cement line
Hot tapping and line stopping was performed with a customised mechanical head.
Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown
Successfully completed energy efficiency measures on a major infrastructure in the UAE.
Wellube Performs High Pressure Gate Valve Milling on Wellheads to Regain Access into Annulus
Wellube helped the client restore production with minimal downtime.
Customised Pipeline Clamp Avoids Operational Disruption
Wellube successfully completed online sealing of 68ā expansion bellow sea water leak in Abu Dhabi.
Platform Leg Decommissioning Completed in 7 Months
Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.
Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria
Successfully completed a 10ā and 12ā double position line stop operation in Nigeria.
20ā Chilled Water Line Isolated Successfully Using Pipe Freezing in Oman
Simultaneous double position pipe freezing performed on 20ā chilled water lines in Muscat.
68ā Enclosure Clamp ensures continuous plant operability
Continuous plant operability managed by performing online leak sealing on a 68ā pipe flange.
66ā water line hot tapped in 36 hours
Successfully performed line stopping and hot tapping on a live 66ā³ cooling water line.