Contact Us
CASE STUDIES

32ā€ Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line

32ā€ Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line

Completed a double position line stop operation on a 32ā€ gas flare.

Read More
Gate valve replaced using customised mechanical head in a fire water cement line

Gate valve replaced using customised mechanical head in a fire water cement line

Hot tapping and line stopping was performed with a customised mechanical head.

Read More
Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown

Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown

Successfully completed energy efficiency measures on a major infrastructure in the UAE.

Read More
Customised Pipeline Clamp Avoids Operational Disruption

Customised Pipeline Clamp Avoids Operational Disruption

Wellube successfully completed online sealing of 68ā€ expansion bellow sea water leak in Abu Dhabi.

Read More
Platform Leg Decommissioning Completed in 7 Months

Platform Leg Decommissioning Completed in 7 Months

Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.

Read More
Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria

Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria

Successfully completed a 10ā€ and 12ā€ double position line stop operation in Nigeria.

Read More
Pipe freezing operation - thumbnail

20ā€ Chilled Water Line Isolated Successfully Using Pipe Freezing in Oman

Simultaneous double position pipe freezing performed on 20ā€ chilled water lines in Muscat.

Read More
68 Enclosure Clamp-thumbnail

68ā€ Enclosure Clamp ensures continuous plant operability

Continuous plant operability managed by performing online leak sealing on a 68ā€ pipe flange.

Read More
folding plugging

66ā€ water line hot tapped in 36 hours

Successfully performed line stopping and hot tapping on a live 66″ cooling water line.

Read More
support
sticky contact
Popup close

    Open chat
    Got a query?
    Hi,
    We specialise in flow management, valve reliability and onsite pipeline solutions.
    How can we help you?