Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.
Hot Tapping 101: The Basics
The whole operation is completed while the line is “live” or in its normal operating conditions.
32” Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line
Completed a double position line stop operation on a 32” gas flare.
Gate valve replaced using customised mechanical head in a fire water cement line
Hot tapping and line stopping was performed with a customised mechanical head.
Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown
Successfully completed energy efficiency measures on a major infrastructure in the UAE.
Wellube Performs High Pressure Gate Valve Milling on Wellheads to Regain Access into Annulus
Wellube helped the client restore production with minimal downtime.
Customised Pipeline Clamp Avoids Operational Disruption
Wellube successfully completed online sealing of 68” expansion bellow sea water leak in Abu Dhabi.
Wellube Charts New Growth Strategy with a Key Appointment
Wellube has announced the appointment of Garry Kidd and completion of rebrand.
Wellube Successfully Completes Line Stopping Job in Qatar
This project is a line stop operation involving isolation of 30” cooling water lines at 3 locations.
Wellube Supplies Largest Diamond Wire Saw to Leading Semi-Government Engineering Company
The scope involved supply of the equipment, training of personnel in operation & maintenance.