The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
Critical Natural Gas Leak Sealed on a 24” Electrically Insulated Flange
The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to Supply
Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.
32” Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line
Completed a double position line stop operation on a 32” gas flare.
Gate valve replaced using customised mechanical head in a fire water cement line
Hot tapping and line stopping was performed with a customised mechanical head.
Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown
Successfully completed energy efficiency measures on a major infrastructure in the UAE.
Wellube Performs High Pressure Gate Valve Milling on Wellheads to Regain Access into Annulus
Wellube helped the client restore production with minimal downtime.
Customised Pipeline Clamp Avoids Operational Disruption
Wellube successfully completed online sealing of 68” expansion bellow sea water leak in Abu Dhabi.
Platform Leg Decommissioning Completed in 7 Months
Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.
Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria
Successfully completed a 10” and 12” double position line stop operation in Nigeria.