Wellube supplied a range of Diamond Wire Saws (16” to 30” and 26” to 60”) along with experienced personnel to a major EPC company to complete platform decommissioning in KSA.
2” Line Stopping Completed with Barrel Split Tee
Wellube successfully performed 2” hot tap and line stop for an instrument line and nitrogen line to assist the client in repairing of the damaged line.
20” Hot Tap Operation Performed on a Spiral Wound Chilled Water Pipe
Wellube completed a 20” hot tap operation with a customised couple reinforcement solution on a 38” chilled water line for a petroleum refinery in Egypt.
Chilled Water Line Isolated Using 16” Single Position Pipe Freezing
Wellube team safely executed qty 2 off 16” Single Position Pipe Freezing to isolate a chilled water line operating at a line temperature between 5.3 degree C to 10.3 degree C and at 5 bar pressure, for a prestigious client to perform their maintenance .activities.
On-line Sealing of Wellhead Master Valve Flange Leak
The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
Anticorrosion Wrap System Installed for 23 Jetty Piles
The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
Critical Natural Gas Leak Sealed on a 24” Electrically Insulated Flange
The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to Supply
Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.
32” Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line
Completed a double position line stop operation on a 32” gas flare.
Gate valve replaced using customised mechanical head in a fire water cement line
Hot tapping and line stopping was performed with a customised mechanical head.