Successfully completed a 10ā and 12ā double position line stop operation in Nigeria.
Wellube and Innovo successfully complete a decommissioning project in the Middle East region
Wellube, with Innovo, successfully completed a multi-million-dollar decommissioning contract in the Middle East region.
20ā Chilled Water Line Isolated Successfully Using Pipe Freezing in Oman
Simultaneous double position pipe freezing performed on 20ā chilled water lines in Muscat.
Hot tapping used to create branch pipeline without shutdown
Wellube completed a 4ā branch from a 12ā main pipeline using hot tapping without shutdown.
68ā Enclosure Clamp ensures continuous plant operability
Continuous plant operability managed by performing online leak sealing on a 68ā pipe flange.
Wellube Completes Pipe Freezing Project at Burj Khalifa
Wellube successfully completed a Pipe Freezing project at Burj Khalifa, the worldās tallest building.
Wellube Announces Collaboration with KSB Group
Wellube, the leading integrated subsea and offshore solution provider, has announced today that its Wellube
66ā water line hot tapped in 36 hours
Successfully performed line stopping and hot tapping on a live 66ā³ cooling water line.
Specialised pipeline clamp avoids pipeline disruption
Specialist pipeline leak clamp designed & delivered to avoid costly production disruption for client.
18ā Water Pipeline isolated by Pipe freezing
Double position pipe-freezing performed as a line Stopping solution for a leading chilled water provider.