Contact Us

AIMCS 2024 Presentation Download

We presented at the Middle East Asset Integrity Management Conference & Showcase (AIMCS) in Abu Dhabi.

Pandiyan Veeramani (Sales Manager, UAE) delivered an insightful presentation on flow management intervention methods, highlighting how pipelines can be efficiently repaired and modified without disrupting operations. The session was enriched with real-time project case studies, showcasing the various innovative solutions available for pipeline maintenance and re-routing.

A huge thank you to everyone who attended and engaged with us. It was incredible to discuss the latest developments in asset integrity management and explore ways to collaboratively enhance asset performance and reliability at your infrastructures across the Middle East.

Special thanks to the organizers for creating such a valuable platform for knowledge exchange and networking. We look forward to continuing these meaningful conversations and driving forward the advancements in our industry.

If you missed the event or want a copy of the presentation, please request for presentation using the form.

Get the Presentation

(Optional)

Why
Choose
Wellube?

Take advantage of our 20+ years of expertise in managing asset integrity for oil & gas, petrochemicals, energy, utility industries. Our flow management – intervention and integrity methods have wide comptability for various application situations.

Combined with a strong global engineering team, we have developed new innovative solutions for our clients, overcoming several critical situations. 

Our services are available worldwide with key offices in UAE, Qatar and India. Consult with our experts today!

Successful Rerouting of a 14” High-Pressure Pipeline in India via Tandem Double Double Line Stop

Client Leading LPG transmission company  Country India Year 2023 Service details Wellube’s hot ta
Read More

Hot Tapping & Double Line Stop Work for Rerouting of Existing Pipeline

Client Mumbai Aviation Fuel Farm Facility Pvt. Limited (MAFFL) Country Mumbai, India Year 2018 – 2
Read More

Chilled Water Line Isolated Using 16” Single Position Pipe Freezing

Wellube team safely executed qty 2 off 16” Single Position Pipe Freezing to isolate a chilled wate
Read More
sticky contact
Popup close

    Open chat
    Got a query?
    Hi,
    We specialise in flow management, valve reliability and onsite pipeline solutions.
    How can we help you?