CASE STUDIES

Diamond Wire Saws used for Platform Decommissioning in KSA

Client Major EPC Company
Country Saudi Arabia
Service details With a combined experience spanning 35 years in the oil & gas industry, Wellube and Mactech have been the driving force behind the tools and techniques used by most underwater machining companies. Let us help you tackle the complex Wire Saws challenges you face with your slot recovery and decommissioning service projects. To know more, get in touch with us at enquiries@wellube.com

Project Summary

Wellube supplied a range of Diamond Wire Saws (16” to 30” and 26” to 60”) along with experienced personnel to a major EPC company to complete platform decommissioning for the Al-Safaniya project in KSA.

Diamond Wire Saw deployed for the project.

Client Requirement to Perform Wire Saws

The client wanted an efficient solution for cutting multi-string casings, pilings and other rounds/square objects during the platform decommissioning. We understood the requirement and recommended the Diamond Wire Saws which are an essential tool for slot recovery and abandonment operations. The client accepted this suggestion, and we provided a range of saws and experienced personnel to handle the project.

Solution Engineered

Wellube provided a complete turnkey solution based on the client’s project needs, we supplied a wide range of Diamond Wire Saws (DWS) with cutting capacities of16” to 30” and 26” to 60”. Our expert On-Site Machining team was also mobilised to efficiently complete the project. The client was extremely pleased with the large spread of customised cutting equipment that Wellube provided. The DWS saws used for the project also saved considerable time hugely on setup, installation, cutting and removal, thus resulting in cost and time saving for the customer.

DWS in action during the platform decommissioning.

Benefits Delivered

  • Customised Diamond Wire Saws as per the client requirement
  • Provided maximum cutting range flexibility
  • Project managed it from end to end for the client
  • Completely QHSE compliant
  • Successful completion of the project within the client deadlines.
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago