Client | Leading district cooling company |
Country | Qatar |
Service details | Pipe freezing can be used to isolate a line to install new valves, diversion of pipes and rectify damaged sections of pipe. It eliminates the need for expensive fluid discharging and recharging whilst minimising system shutdown time. In addition, it reduces the resources needed for the repair and modification work. The methodology can freeze on pipe sizes varying from ¼ “to 24” and the freeze plug can be maintained for as long as is required. To know more, get in touch with us at enquiries@wellube.com |
Wellube team safely executed qty 2 off 16” Single Position Pipe Freezing to isolate a chilled water line operating at a line temperature between 5.3 degree C to 10.3 degree C and at 5 bar pressure, for a prestigious client to perform their maintenance activities.
The Centre point is the ice plug which was formed after 3 hours of constant feeding of Liquid Nitrogen
As part of the client’s maintenance activities, they wanted to install a new butterfly valve and expansion joint in their pipeline. The customer wanted to execute these installations without affecting the operation of the plant, Wellube after understanding the requirements suggested pipe freezing as the best solution for the client to isolate the pipeline.
The team successfully managed these challenges and completed the project within the client deadline.
Wellube team successfully isolated the chilled water line on which the maintenance activities had to be performed by executing two 16” single position pipe freezing. The line was operating between 5.3 degree C to 10.3 degree C and 5 bar pressure.
Zero flow was maintained for 4 hours to ensure the completion of the maintenance work, liquid Nitrogen required for the pipe freeze ice plug was calculated and monitored continuously by the Wellube team to ensure smooth operation for the client.
The client was really pleased with the quality of Wellube’s project delivery and has recommended our services to their other facilities.
Pipe freezing in progress
Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…
Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…
Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…
As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…
Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…
Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…