CASE STUDIES

20” Hot Tap Operation Performed on a Spiral Wound Chilled Water Pipe

Client Petroleum refinery
Country Egypt
Service details Wellube’s hot tapping and line stopping service is a cost-effective way of enabling repairs, maintenance, modifications, or reconfiguration work on existing piping systems – on either a planned or emergency basis. Our hot tap operation prevents unwanted shutdowns and keeps critical piping and pipeline systems online during tie-ins, relocations, repairs, retrofits, and routine maintenance. To know more, get in touch with us at enquiries@wellube.com

Project Summary

Wellube completed a 20” hot tap operation with a customised couple reinforcement solution on a 38” chilled water line for a petroleum refinery in Egypt.

20” hot tapping in progress on the 38” chilled water line

Client Requirement For Hot Tap Operation

The client wanted to create a new tie in connection of the same size from the existing chilled water pipeline without shutting down the pipeline, Wellube was contacted to perform the operation to facilitate the operation

Challenges Faced

  • No shutdown or depressurization of the pipelines was allowed
  • Shipping the client requirements from UAE and ensuring our workforce were all available at the site without any delays caused due to the pandemic.

Solution Engineered By Performing Hot Tap Operation

After evaluating the client’s requirement, we performed 20” hot tap operation on the 38” spiral wound chilled water pipeline. Owing to the unique design of the pipe, we also directed the client in welding a coupon reinforcement to avoid the coupon from falling off (or spring out after the final cut) during the hot tap.

 Wellube engineers monitoring the hot tap equipment

As the design we had suggested for coupon reinforcement was simple, the client was able to get it fabricated and welded according to the schedule. This was then welded after the fit-up and welding of the hot tap fitting. Standard coupon reinforcement would have been more complicated and required additional logistics. In this case, we just needed a smaller size pipe to weld as a coupon reinforcement after design confirmation which was sufficient to prevent the spring out on a spiral wound pipe.

The customised coupon reinforcement solution welded on the pipeline

The client appreciated the Wellube team’s professionalism and efforts in completing the full scope of work as scheduled before their planned shutdown.

Benefits Delivered

  • No interruption to water supply during the project execution
  • Completely HSEQ compliant
  • Successful completion of the project within the client deadlines.
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar
Tags: Hot Tapping

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago