CASE STUDIES

Successful Rerouting of a 14” High-Pressure Pipeline in India via Tandem Double Double Line Stop

Client Leading LPG transmission company
Country India
Year 2023
Service details Wellube’s hot tapping and line stopping service is a cost-effective way of enabling repairs, maintenance, modifications, or reconfiguration work on existing piping systems – on either a planned or emergency basis. Our hot tap operation prevents unwanted shutdowns and keeps critical piping and pipeline systems online during tie-ins, relocations, repairs, retrofits, and routine maintenance.

To know more, get in touch with us at enquiries@wellube.com.  

Summary of the Project

Wellube delivered a complete package of solutions to a client encompassing the engineering, design, and the supply of a 14” 600# Line Stop Tee for rerouting a high-pressure pipeline. Additionally, inservice welding, hot tapping, and line stopping were executed to facilitate the rerouting of the pipeline through a Tandem Double Double Scheme, incorporating a bypass.

Client Requirement

The client expressed the need to reroute the current high-pressure LPG pipeline without initiating a shutdown, aiming to avoid any production losses. Considering the existing pipeline’s river crossing and the substantial flow of river water, the pipeline was elevated 1m above the ground bottom level. 

Challenges Faced

  • The site’s location posed a challenge as the pipeline rerouting involved crossing a river.
  • The new pipeline spanned approximately 550 meters, and adverse weather conditions, such as heavy rain, made the movement between the upstream and downstream sides challenging.

Bespoke Solution Provided

Wellube team worked with the client to understand their requirements, we provided a complete end to end solution by engineering and designing the specialised line stop fittings as well as performing a series of services including In-Service Welding, Hot tapping and Line Stopping for the successful rerouting whilst maintaining the client’s efficient and reliable operation.  

As there was a river crossing which had a span of 550mtr in length, the movement of team, equipment, and earth moving equipment was a big challenge. However, considering the critical nature of our work, we made the above-mentioned arrangements at both ends of the river to tackle the challenges and to avoid loss of working time. A two-way communication was established between the entire site team and client for smooth coordination activity to ensure execution of the job with complete safety as per client and Wellube requirements.

Benefits Delivered

  • The project was executed with complete HSE compliance and safety despite the challenges involved during execution.
  • End to end integrated solution provided.
  • Technical support and expertise by Wellube’s team of specialists.
  • Project was executed within the timeline provided by the client.
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago