The client approached us with an urgent request to arrest a steam leak in their heat exchanger flange which was operating at 5.5 bar pressure and temperature of 118°C. They wanted us to provide a solution that would avoid production loss and shutdown.
Wellube team visited the site and assessed the situation, following which we recommended online leak sealing as the preferred solution to seal the leak.
Based on the site requirements, our design team engineered a 6 part ‘L’ shaped 2-meter ring clamp which was then manufactured according to ASME Sec VIII DIV 1. The clamp was then placed around then flange to seal the leak without caulking.
The entire project was completed well within the client deadlines and the client was pleased as there were no disruption to production
The machining of the clamp prior to installation
The team (Francis Aldrin, Sumith, Deepak Unni, Joenard and Niyas Salem) who successfully completed the project pose with their appreciation certificates
Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…
Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…
Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…
As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…
Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…
Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…