Gate valve replaced using customised mechanical head in a fire water cement line

Client Major Petroleum company
Country Qatar
Service Details Our specialist hot tapping and line stopping service is a cost-effective way of enabling repairs, maintenance, modifications, or reconfiguration work on existing piping systems – on either a planned or emergency basis. Our solution prevents unwanted shutdowns and keeps critical piping and pipeline systems online during tie-ins, relocations, repairs, retrofits, and routine maintenance. Get in touch with us at enquiries@wellube.com

Summary of the Project:

Wellube has successfully completed hot tapping and line stopping with a customised mechanical head on a 16” line (which was connected to a 24” main line) and replaced the damaged 24” gate valve in the fire water cement line.

Client Requirement:

The client had a damaged 24” gate valve in their fire water tank line which needed to be replaced without interruption to the full firefighting system.

Challenges faced

  • Complexity involving executing hot tapping on a cement lined pipeline
  • As the valve was old, the removal of the old stud & bolts from the valve by hot bolting was also a concern

Unique Solution delivered

Wellube team visited the site and had discussions with the client to develop a customised solution considering the age of the pipeline which is over 20 years. Based on their inputs, we performed an inhouse mock-up test on a pipe sample provided by the client to confirm the ideal line stop operation for the cement pipeline. After the successful mock-up test, we modified our 16” mechanical head equipment to suit the cement lined pipe’s internal diameter. We also designed 3 different outside diameter elements for installing in the mechanical head. After completion of the hot tapping and removal of the coupon, we completely isolated the line with the modified mechanical head and hot bolting was performed to replace the damaged valve. The entire execution was done with utmost care to ensure a safe and successful valve replacement.

Benefits delivered

  • Completed the project ahead of schedule
  • Achieved 100% seal on the cement line
  • Fully HSEQ compliant
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago