The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.
Completed a double position line stop operation on a 32” gas flare.
Hot tapping and line stopping was performed with a customised mechanical head.
Successfully completed energy efficiency measures on a major infrastructure in the UAE.
Wellube helped the client restore production with minimal downtime.
Wellube successfully completed online sealing of 68” expansion bellow sea water leak in Abu Dhabi.
Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.
Successfully completed a 10” and 12” double position line stop operation in Nigeria.