CASE STUDIES

Anticorrosion Wrap System Installed for 23 Jetty Piles

The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity

4 years ago

Critical Natural Gas Leak Sealed on a 24” Electrically Insulated Flange

The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity

4 years ago

48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to Supply

Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.

4 years ago

32” Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line

Completed a double position line stop operation on a 32” gas flare.

4 years ago

Gate valve replaced using customised mechanical head in a fire water cement line

Hot tapping and line stopping was performed with a customised mechanical head.

4 years ago

Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown

Successfully completed energy efficiency measures on a major infrastructure in the UAE.

5 years ago

Wellube Performs High Pressure Gate Valve Milling on Wellheads to Regain Access into Annulus

Wellube helped the client restore production with minimal downtime.

5 years ago

Customised Pipeline Clamp Avoids Operational Disruption

Wellube successfully completed online sealing of 68” expansion bellow sea water leak in Abu Dhabi.

5 years ago

Platform Leg Decommissioning Completed in 7 Months

Wellube performed decommissioning of several assets on the offshore platforms of a leading asset owner.

5 years ago

Line Stopping Used to Change Leaking Valve with Zero Interruption to Production in Nigeria

Successfully completed a 10” and 12” double position line stop operation in Nigeria.

5 years ago