62” X 4” Tee Enclosure Clamp Seals Leak with Zero Production Loss

Client Leading Petrochemical Company
Country Qatar
Service details A leak from a piping system during operation can lead to the escape of line medium into the atmosphere and, depending on the severity of the leak, it could lead to an unplanned & costly shutdown. Wellube maintains a stock of semi-finished clamps and our in-house online leak sealing manufacturing facilities enables us to provide a quick turnaround to arrest leaks with minimal loss of production and environmental impact. Our selection of specially formulated compounds is compatible with most line mediums & temperatures encountered in normal plant operations. To know more, get in touch with us at enquiries@wellube.com

Project Summary

Wellube successfully sealed a sea water leak in the Tee branch of a client pipeline using a 62” x 4” Tee enclosure.

Parts of the clamp.

Client Requirement

The client had a leak in the Tee branch which they wanted to be sealed without affecting the production of the facility.

Solution Engineered

Based on the site conditions and measurements, our design team engineered a 62” x 4” Tee enclosure with strong back. We included a strong back to hold the original clamp on to the profile designed for the landing portion of the leaking 62” x 4” Tee, as this helps to hold the original clamp firmly without allowing any leak to pass after injection of the leak sealing compound. The clamp was manufactured within a span of 5 days and installed at the site within a 10-hour shift. The client was very pleased with our work as the project was completed without a shutdown.

The complete clamp set up prior to installation.

Benefits Delivered

  • Avoided shutdown ensuring production continuity.
  • Quick and efficient solution.
  • Project managed it from end to end for the client.
  • Completely QHSE compliant.
  • Successful completion of the project within the client deadlines.
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago