CASE STUDIES

36” Crude Oil Line Isolated Using Line Stopping

Client Leading National Oil Company
Country UAE
Service details Wellube’s Hot tapping and Line stopping service is a cost-effective way of enabling repairs, maintenance, modifications, or reconfiguration work on existing piping systems – on either a planned or emergency basis.Our solution prevents unwanted shutdowns and keeps critical piping and pipeline systems online during tie-ins, relocations, repairs, retrofits, and routine maintenance.

To know more, get in touch with us at enquiries@wellube.com

Project Summary

Wellube has successfully completed line plugging on a 36”150# crude oil line through inline tee to provide isolation during shut down to cold cut and replace the existing section of the pipeline.

The equipment prior to mobilisation to the site.

Client Requirement

The client wanted to replace an existing section of their crude oil pipeline as part of their planned maintenance shutdown. To enable the repair, they reached out to Wellube to support them with equipment and experienced personnel to perform line stopping to isolate the pipeline.

Challenge Faced

As this was an urgent requirement, the equipment had to be prepared and delivered within a short timeframe to the client site. To expedite the process, we designed and engineered modifications to the line stop heads to suit the existing inline tees for insertion and providing isolation. This helped in ensuring the equipment was ready to meet client’s schedule as needed.

Solution Engineered

Wellube team completed the line plugging operation on the 36” 150# crude oil line by modifying the existing plugging head to operate through the inline tee and provide isolation during the client’s planned shutdown. Following the line plugging, the client performed cold cutting and replaced the existing section of the pipelines.
We also provided the customised 26” and 30” line stopping equipment for their project requirements. The client was extremely pleased with the team’s technical knowledge and professionalism.

The line stopping equipment before deployed for the project.

Benefits Delivered

  • Project managed it from end to end for the client.
  • Completely QHSE compliant.
  • Successful completion of the project within the client deadlines.
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago