News

Wellube completes significant leak sealing project in Africa

Wellube has recently completed a significant leak sealing project for a client based in the African sub-continent. A steam leak was reported at one of the geothermal wells with a leaking Master Valve Flange. Our engineers were called to carry out a live demonstration of a leak sealing solution that would benefit no stoppage in operation and avoid quenching of the valve.

After conducting a thorough site survey, the team designed a Ring Clamp that would fit between two flanges of 10” 900# Master Valve, operating at 1,000 to 2,000 psi and above 200 deg. C. The design and fabrication of the clamp were in accordance with ASME Section VIII Div1, boiler and pressure vessel code and material selection as per ASME Sec II Div 1. The clamp was then successfully installed and injected with sealants in order to complete the leak sealing operation.

By completing the work online, the client was able to avoid quenching of the well which would have otherwise resulted in the complete loss of well and stoppage in operation.

The process of sealing leaks in pressurized components such as valves, flanges, fittings, etc., is well established. Our leak sealing engineers are capable of performing the process successfully on several mediums such as steam, water, hydrocarbons, and on a wide range of chemical systems at pressures up to 8,500 psi and temperatures from minus 320 deg. F to plus 1800 deg. F.

Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago