News

Wellube Introduces Advanced Double Isolation Pipeline Stopper Technology for Enhanced Safety

Leading flow management intervention and integrity experts, Wellube, a Unique Group company, has announced the launch of its latest innovation, the Double Isolation Pipeline Stopper (DIPS). This innovative solution, developed in-house by the Wellube Research and Development team, marks a significant advancement in pipeline intervention and safety management.


The Double Isolation Pipeline Stopper (DIPS) provides a fail-safe isolation using a single size-on-size hot tap intervention, eliminating the need for additional tapping for bleed and vent ports. This approach reduces risks and enhances safety, making it ideal for use in critical and harsh environments.

Garry Kidd, Managing Director at Wellube, said: “The introduction of our Double Isolation Pipeline Stopper (DIPS) underscores Wellube’s commitment to delivering cutting-edge solutions that enhance safety and efficiency in flow management and intervention. DIPS is designed to provide our clients with unmatched reliability and safety, ensuring their critical pipeline operations remain uninterrupted and online.”

Wellube’s DIPS technology is third-party approved and is designed to reduce the risk to both asset and operator in highly volatile operational situations, ensuring it meets the highest performance standards trusted by clients globally. It is the safer way to enable repairs, maintenance, modifications, or reconfiguration work on existing piping systems, whether on a planned or emergency basis.

Photo showcasing a real-life model of Wellube's Double Isolation Pipeline Stopper

Wellube remains committed to continuously developing and integrating new technologies to meet and exceed our clients’ needs, ensuring that we remain at the forefront of the industry.

For more information on the service check out our new DIPS page.


Shyam Karthik Kothandaraman

Share
Published by
Shyam Karthik Kothandaraman

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago