Client | Leading National Oil Company |
Country | Qatar |
Service details | A leak from a piping system during operation can lead to the escape of line medium into the atmosphere and, depending on the severity of the leak, it could lead to an unplanned & costly shutdown. ellube maintains a stock of semi-finished clamps and our in-house online leak sealing manufacturing facilities enables us to provide a quick turnaround to arrest leaks with minimal loss of production and environmental impact. Our selection of specially formulated compounds is compatible with most line mediums & temperatures encountered in normal plant operations. To know more, get in touch with us at enquiries@wellube.com |
Wellube successfully repaired a flare line with multiple sections of corrosion using a 2.9m long 24” enclosure clamp, with zero interruption to production. This is one of the largest clamps manufactured and installed by our Qatar team.
Design of the clamp
The client had performed an inspection of their pipelines and it was discovered that a large section of the flare line had been corroded. The client then approached Wellube to provide online leak sealing with a solution that can repair the corroded section with no interruption to operation.
Wellube team after discussing with the client and assessing the situation, recommended installation of an enclosure clamp as the preferred repair solution.
Based on the site requirements, our design team engineered a large 2.9m long 24” enclosure clamp. It was designed and manufactured according to ASME standards to withstand a temperature of 200°C and pressure of 0.7MPA, it weighed around 2 Tons.
The clamp was fabricated within a very short time frame and once in situ, it was successfully installed. This was followed by the injection of sealants to seal off the clamp completely. The project was safely and successfully implemented allowing the continuous operation of the line without a costly shutdown.
The client was extremely pleased with the competence and dedication of the Wellube team to provide the best solution to mitigate the corrosion in the pipeline.
The 2.9m long 24″ enclosure clamp which was designed, manufactured and installed in Qatar
Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…
Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…
Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…
As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…
Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…
Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…