Flare Line Leak Sealed Online with a 24” Large Enclosure Clamp

Client Leading National Oil Company
Country Qatar
Service details A leak from a piping system during operation can lead to the escape of line medium into the atmosphere and, depending on the severity of the leak, it could lead to an unplanned & costly shutdown.
ellube maintains a stock of semi-finished clamps and our in-house online leak sealing manufacturing facilities enables us to provide a quick turnaround to arrest leaks with minimal loss of production and environmental impact. Our selection of specially formulated compounds is compatible with most line mediums & temperatures encountered in normal plant operations.
To know more, get in touch with us at enquiries@wellube.com

Project Summary

Wellube successfully repaired a flare line with multiple sections of corrosion using a 2.9m long 24” enclosure clamp, with zero interruption to production. This is one of the largest clamps manufactured and installed by our Qatar team.

Design of the clamp

Client Requirement

The client had performed an inspection of their pipelines and it was discovered that a large section of the flare line had been corroded. The client then approached Wellube to provide online leak sealing with a solution that can repair the corroded section with no interruption to operation.

Challenges Faced

  • In the pipeline, there were multiple changes in geometry which needed to be encapsulated.
  • The difficulties and risk in installing such a large clamp at a high elevation.
  • Fabricating of the clamp owing to its big size.

Solution Engineered

Wellube team after discussing with the client and assessing the situation, recommended installation of an enclosure clamp as the preferred repair solution.
Based on the site requirements, our design team engineered a large 2.9m long 24” enclosure clamp. It was designed and manufactured according to ASME standards to withstand a temperature of 200°C and pressure of 0.7MPA, it weighed around 2 Tons.
The clamp was fabricated within a very short time frame and once in situ, it was successfully installed. This was followed by the injection of sealants to seal off the clamp completely. The project was safely and successfully implemented allowing the continuous operation of the line without a costly shutdown.
The client was extremely pleased with the competence and dedication of the Wellube team to provide the best solution to mitigate the corrosion in the pipeline.

The 2.9m long 24″ enclosure clamp which was designed, manufactured and installed in Qatar

Benefits Delivered

  • Completed the project within schedule
  • Avoided shutdown ensuring production continuity
  • Quick and efficient solution
  • Achieved 100% seal on the line.
  • Fully HSEQ compliant
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago