2” Line Stopping Completed with Barrel Split Tee
Wellube successfully performed 2” hot tap and line stop for an instrument line and nitrogen line to assist the client in repairing of the damaged line.
Wellube successfully performed 2” hot tap and line stop for an instrument line and nitrogen line to assist the client in repairing of the damaged line.
Owing to the nature of the work that we are involved in, every project is exciting and challenging. This makes me look forward to each day at work
Working in Wellube, I feel that I am working in one of the finest engineering service companies in the region where I learn from veteran professionals across disciplines who are always willing to lend a hand of support in need that I can learn from and truly rely upon.
Wellube completed a 20” hot tap operation with a customised couple reinforcement solution on a 38” chilled water line for a petroleum refinery in Egypt.
Hot tapping can involve various risks and hazards while performing maintenance or repairing of pipelines. This blog discusses various strategies & effective practices to manage and mitigate hazards.
Wellube team safely executed qty 2 off 16” Single Position Pipe Freezing to isolate a chilled water line operating at a line temperature between 5.3 degree C to 10.3 degree C and at 5 bar pressure, for a prestigious client to perform their maintenance .activities.
Each day we have several client operational challenges presented to us for which we engineer solutions together as a team.
The clamp was successfully installed at the site and a Sealant Compound was injected into the flange cavity
The whole operation is completed while the line is “live” or in its normal operating conditions.
Wellube has announced the appointment of Garry Kidd and completion of rebrand.