Jiju Vijayakumar

48” Hot Tap on Drinking Water Pipeline Successfully Completed with Zero Interruption to Supply

Performed hot tap operation on a 48” ductile iron water pipeline to install new connections.

4 years ago

Hot Tapping 101: The Basics

The whole operation is completed while the line is “live” or in its normal operating conditions.

4 years ago

32” Line Stop With Bypass For Butterfly Valve Installation On A Gas Flare Line

Completed a double position line stop operation on a 32” gas flare.

4 years ago

Gate valve replaced using customised mechanical head in a fire water cement line

Hot tapping and line stopping was performed with a customised mechanical head.

4 years ago

Energy Optimisation Project Successfully Completed using On-Line Valve Insertion for Pipe Isolation Without Shutdown

Successfully completed energy efficiency measures on a major infrastructure in the UAE.

5 years ago

Wellube Performs High Pressure Gate Valve Milling on Wellheads to Regain Access into Annulus

Wellube helped the client restore production with minimal downtime.

5 years ago

Customised Pipeline Clamp Avoids Operational Disruption

Wellube successfully completed online sealing of 68” expansion bellow sea water leak in Abu Dhabi.

5 years ago

Wellube Charts New Growth Strategy with a Key Appointment

Wellube has announced the appointment of Garry Kidd and completion of rebrand.

5 years ago

Wellube Successfully Completes Line Stopping Job in Qatar

This project is a line stop operation involving isolation of 30” cooling water lines at 3 locations.

5 years ago

Wellube Supplies Largest Diamond Wire Saw to Leading Semi-Government Engineering Company

The scope involved supply of the equipment, training of personnel in operation & maintenance.

5 years ago