CASE STUDIES

18” Water Pipeline isolated by Pipe freezing

Client Leading supplier of chilled water
Country UAE
Year February 2018
Service details

Pipe freezing can be used to isolate a line to install new valves, diversion of pipes and rectify damaged sections of pipe. It eliminates the need for expensive fluid discharging and recharging whilst minimizing system shutdown time. In addition, it reduces the resources needed for the repair and modification work. The methodology can freeze on pipe sizes varying from ¼ “to 24” and the freeze plug can be maintained for as long as is required.

Get in touch with us at enquiries@wellube.com

Summary of the Project

Wellube performed 18” Double position pipe-freezing as a Line Stopping solution for a leading supplier of chilled water in UAE.

Pipe freezing jacket full of liquid nitrogen

Client Requirement

The client consulted us to isolate the chilled water line to perform remedial work of cutting a pipe section and install new valves in the line to connect to a new building plot. If isolation was not feasible, the client would have had to drain the entire length of pipe to perform the remedial works which would have been an expensive option and wastage of resources.

There was also a limitation on space at the nearby road crossing and so chamber demolition was not feasible, the requirement to design a purpose-built freezing jacket as per site conditions was called for.

Unique Solution we delivered

Wellube designed, manufactured, and installed freezing jackets according to applicable codes and specifications, we then used pipe-freezing method using Liquid Nitrogen to achieve an ice plug to isolate the pipeline to install new valves in it.

Clamshell cold cutting machine was used for cutting and prepping the pipe

The mobilisation took less than one week to complete and was cost-effective and had the quickest turnaround time to fix the problem.

After the freeze, the pipe segment is cut, the ice plug is shown here.

After the freeze, the pipe segment is cut

Benefits delivered

  • Economical as compared to other line isolation methods
  • Mobilized to the site within a week
  • No unwanted branches/fixtures left at line stop point as compared to Line Stopping.
  • Site work was minimized to a maximum of two days when compared to other line isolation methods which can exceed six days
  • Clamshell cold cutting machine was used for cutting and prepping the pipe
Jiju Vijayakumar

Share
Published by
Jiju Vijayakumar

Recent Posts

25 Bar, 350 °C Steam Leak Successfully Sealed in UAE

Before After Client Dubai Electricity & Water Authority (DEWA) - Power & Utilities Industry Country…

3 weeks ago

Online Leak Sealing on Wellhead Flange Leak in Costa Rica

Before In-Progress After Client Geochem (Geo Thermal – Energy Industry) Country Costa Rica Year 2022…

2 months ago

Front-End Engineering Design and 14” Hot Tapping on 42” & 52” Natural Gas Pipeline

Client Oil & Gas Client Country United Arab Emirates (UAE) Year 2024 Details Hot tapping…

2 months ago

Redefining Pipeline Intervention

As featured in World Pipelines Magazine - discover how Wellube is redefining pipeline intervention with…

5 months ago

42” Hot Tapping on 48” #600 Crude Oil Pipeline and 64” #150 Ship Loading Pipeline

Client SK Engineering and Construction (SKEC) Country Fujairah, United Arab Emirates (UAE) Year 2023 Details…

7 months ago

24” Leaking Offshore Gas Pipeline Arrested Using Online Leak Sealing Solution

Client Leading Offshore Oil and Gas Company Country United Arab Emirates (UAE) Year 2021-2022 Details…

7 months ago